Fabrication of 6000 tonne oil platform jacket

Project: Fabrication of 6000 tonne steel jacket and 3000 tonne topside for installation in the Apache Forties oilfield.

Equipment: Weldex had 9 cranes on hire at the fabrication yard, ranging from 50 tonne to 600 tonne capacity for the entire fabrication period.

Activity: Multi-crane lifts were involved on site during assembly construction.