Case Studies

Construction of London 2012 Olympic Arena

Construction of London 2012 Olympic Arena

Project: Erection of steel frameworks for the London Olympic Stadium. Equipment: Liebherr LR11350, LR1600, LR1300 and LTR1100. Activity: Construction of the stadium involved Weldex crawler cranes erecting all steel frameworks. A…

> Read more