Beatrice Field Demonstrator Project for Talisman Energy 2006-2007.
Tandem lift of 330te Nacelle with Demag CC2800-1 and M2250 and installation of 128te rotor using Kobleco SL6000


Marchwood HRSG Power Station - Demag CC2800-1 used for boiler house erection and chimney stack lifts, 2008.

Liebherr LR1200 luffer at Dublin T2 Airport erection - June 2008

Kobelco SL6000 during Queen Bess upgrade at Corus Steelworks Scunthorpe . Luffer erected over gas pipe.

Project Ensus at Wilton May 2008, Demag CC2800-1 during module lift.

Dalswinton wind farm November 2007, erection of 15 WTG using new LR1300W-D

LR1400/2 SDB on Cambridge Cycle bridge lift 2007

Wind Farm Tower Loadouts at Stornoway, 46te at 18m using LR1200

Heathrow-Terminal 5 - Trial Abutment Erection at Dalton and at Heathrow with Demag CC2500 SWSL


Wembley Football Stadium - Stand Erection

Emirates Stadium Project - Roof Truss Erection for Arsenal

Wind Farm Erection: Smola 2, Pauls Hill, Rothes, Farr





Cruach Mhor Wind Farm, Scroby Sands, North Hoyle Turbine Erection / Handling



BP Magnus Platform - Upper Riser Frame Tandem Loadout

Fabrication in Inverness Depot
BP Magnus PLEM Loadout at Dundee Using Demag CC2800 SSL
|