Demag CC2500SSL with wheeled carrier offloading piles for Vestas Scroby Sands ofshore wind farm at Great Yarmouth Weldex crane hire logo
left spacer one inch maybe long spacer to centre text  
long spacer to centre text
 
recent news
 
spacer
 
18 - 20 Harbour Road,
Inverness IV1 1UA
Tel: +44 (0) 1463 220333
Fax : +44 (0) 1463 241616
Email: cranes@weldex.co.uk
 
       
  Gallery    
 
Play the Weldex Video - click here!
Click to play the Weldex video of the erection of the Beatrice Offshore Wind Turbine. Tandem lift of a 330te 5MW Nacelle.
   
 

Beatrice Field Demonstrator Project for Talisman Energy 2006-2007.

Tandem lift of 330te Nacelle with Demag CC2800-1 and M2250 and installation of 128te rotor using Kobleco SL6000

Beatrice 5MW Nacelle at 350te being tandemlifted with CC2800-1 and M2250 at Nigg

Beatrice 128te Rotor installed with Kobelco SL6000 heavy luffer at Nigg 2007

Marchwood HRSG Power Station - Demag CC2800-1 used for boiler house erection and chimney stack lifts, 2008.

Marchwood Power Station, Demag CC2800-1 lifting chimney sections June 2008 for Somi

Liebherr LR1200 luffer at Dublin T2 Airport erection - June 2008 for Watson Steel

LR1200 on 26m tower and 29m luffer for 20te steel erection under 47m radar ceiling

Kobelco SL6000 during Queen Bess upgrade at Corus Steelworks Scunthorpe . Luffer erected over gas pipe.

SL6000 luffer eerection over gas pipe at Corus Scunthorpe 2008

Project Ensus at Wilton May 2008, Demag CC2800-1 during module lift.

CC2800-1 Ensus at Wilton

Dalswinton wind farm November 2007, erection of 15 WTG for REpower using new LR1300W-D

LR1300 W with derrick on 86m boom and 8m EHD fly lifting top tower.

Watson Steel using LR1400/2 SDB on Cambridge Cycle bridge lift 2007

LR1400 for Watson Steel at Cambridge

 

Wind Farm Tower Loadouts at Stornoway for CamCal, 46te at 18m using LR1200

Loading of 6 towers onto ship at Arnish, contract lift and seafastening design by Welde

 

Heathrow-Terminal 5 - Trial Abutment Erection at Dalton and at Heathrow with Demag CC2500 SWSL

Demag CC2500SWSL Luffer at Dalton for Trial Erection of Abutment for Heathrow T5

Heathrow T5: Demag CC2500SWSL and LR1280 luffers for Abutment erection


Wembley Football Stadium - Stand Erection

Wembley Stadium: Weldex cralwer cranes from LR1750 to PPM 50te used for steel erection


Emirates Stadium Project - Roof Truss Erection for Arsenal

Emirates Stadium Project erection of secondary roof truss.


Wind Farm Erection: Smola 2, Pauls Hill, Rothes, Farr for Siemens

Smola 2 WTG Erection with LR1400/2-W for Siemens

Smola 2, Norway: Single Blade Erection using Siemens Lifting Yoke and LR1400W

Rothes WTG Top Tower Erection for Siemens using LR1400W Narrow Track

 

Liebherr LR1400/2-W Narrow Track Crawler walking fully rigged at Rothes for Siemens

Siemens 2.3MW WTG completed at Farr Wind Farm


Cruach Mhor Wind Farm, Scroby Sands, North Hoyle Turbine Erection / Handling for Vestas

V52 Rotor Erection at Cruach Mhor using LR1160W Narrow Track Crawler

Scroby Sands Pile Offload at Great Yarmouth for Vestas

              North Hoyle Floating Pile Loadout at Mostyn for Vestas

 


BP Magnus Platform - Upper Riser Frame Tandem Loadout

 

BP Magnus Field Riser


Fabrication in Inverness Depot

Basket fabrication in Inverness


BP Magnus PLEM Loadout at Dundee Using Demag CC2800 SSL

Magus PLEM