London TBM Installation
Project: The Thames Water Lee Tunnel is the first stage of improvement to London’s waste water system. The tunnel, with internal diameter of 7.2m and length of 6.9km has been…
The sky's the limit
Project: The Thames Water Lee Tunnel is the first stage of improvement to London’s waste water system. The tunnel, with internal diameter of 7.2m and length of 6.9km has been…
© 2024 Weldex (International) Offshore Ltd
Privacy Policy | Cookie Policy | Sitemap | Website by ib3